Scope of the bridge rehabilitation work

The scope of the proposed bridge structure rehabilitation is the following:

  • Patch repair of concrete deck, abutments, retaining walls, piers, deck soffit and fascias;
  • Removal and replacement of the existing asphalt and waterproofing system;
  • Replacement of parapet walls, curbs and sidewalks to current standards;
  • Convert to semi-integral configuration by constructing new semi-integral deck extensions at the abutments; and
  • Repair of bearing seats and installation of new bearings at abutments.



Highway 403 Bridge Rehabilitation Click for Home Page Click for Contact Us Page Print This Page


Notice of Detail Design (PDF/20kb)