Scope of the bridge rehabilitation work
The scope of the proposed bridge structure rehabilitation is the following:
- Patch repair of concrete deck, abutments, retaining walls, piers, deck soffit and fascias;
- Removal and replacement of the existing asphalt and waterproofing system;
- Replacement of parapet walls, curbs and sidewalks to current standards;
- Convert to semi-integral configuration by constructing new semi-integral deck extensions at the abutments; and
- Repair of bearing seats and installation of new bearings at abutments.
Notice of Detail Design (PDF/20kb)